Electrical, Instrumentation, And Control System Works For New Power Plant
PROJECT

Electrical, Instrumentation, And Control System Works For New Power Plant

Turaif, Saudi Arabia Completed: N/A

Project Overview

Project Overview

Scope of Project:

The scope covers electrical assembly and erection for the entire system, including HV/MV transformers, switchgears, generators, panels, cable trays, conduits, and cables, as well as the underground and aerial grounding systems.

It also includes the HV UGC 34.5 kV cable between the main transformer and substation, power and control cables (LV feeders, trip circuits, interlocks, and fiber optics) from the plant electrical building to the substation.

Additionally, the scope encompasses instrumentation assembly, including supports, tubing, manifolds, pneumatic connections, conduits, cable trays, signal derivation/distribution boxes, and related instruments

    Key Achievements

    • Zero LTI: Over 500,000 safe man-hours achieved without a single lost-time incident.
    • Schedule Beaten: Completed mechanical handover ahead of the baseline schedule.
    • Quality Excellence: 100% first-time pass rate on all critical NDT and pressure tests.

    Project Details

    ClientsCOX Energy/MAADEN
    LocationTuraif, Saudi Arabia
    Contract DurationN/A
    Total ManhoursN/A

    Have a similar project?

    Our engineering experts are ready to discuss your next industrial construction requirement.

    Contact Us Today

    Our Strategic Office Locations

    This extensive network ensures our strong global presence across all GCC countries, enabling us to provide seamless and professional assistance wherever your projects are located.

    Saudi Arabia

    Jubail and Riyadh

    Pakistan

    Lahore

    Bahrain

    Manama

    Contact Us →
    Construction Workers on Steel Structure