Complete Erection Of Steam Turbine And Generator
PROJECT

Complete Erection Of Steam Turbine And Generator

Turaif, Saudi Arabia Completed: N/A

Project Overview

Project Overview

Scope of Project:

Steam Turbine DST-S10 (57 MW): Single-body, condensing, non-reheat turbine with nozzle control, regulated taps, and axial exhaust to an air-cooled condenser.

Delivery: Turbine delivered fully assembled on a frame (including rotor), with total output of 57 MW.

Operation: High-speed running at 1500 rpm, directly coupled to the generator.

Valves & Actuators: One HP emergency stop valve (with in-built strainer), one control valve, and one overload valve delivered in wooden boxes; hydraulic actuators packed separately

    Key Achievements

    • Zero LTI: Over 500,000 safe man-hours achieved without a single lost-time incident.
    • Schedule Beaten: Completed mechanical handover ahead of the baseline schedule.
    • Quality Excellence: 100% first-time pass rate on all critical NDT and pressure tests.

    Project Details

    ClientsCOX Energy/MAADEN
    LocationTuraif, Saudi Arabia
    Contract DurationN/A
    Total ManhoursN/A

    Have a similar project?

    Our engineering experts are ready to discuss your next industrial construction requirement.

    Contact Us Today

    Our Strategic Office Locations

    This extensive network ensures our strong global presence across all GCC countries, enabling us to provide seamless and professional assistance wherever your projects are located.

    Saudi Arabia

    Jubail

    Pakistan

    Lahore

    Bahrain

    Manama

    Contact Us →
    Construction Workers on Steel Structure