Supply & Installation of Ducts and14 NEDERMAN Arms & 2 Grinding Machine connection


Mechanical Works:
- Routing: Lay out the ducts, ensuring that they are positioned to allow for optimal airflow and minimal obstruction.
- Mounting: Secure ducts to walls using brackets and hangers. Ensure the ducts are level to prevent dust build-up in low points.
- Sealing: All joints are properly sealed to prevent leaks and maintain efficiency.
- Inlets and Outlets: Install duct inlets near the dust source (grinding machines) and outlets for clean air.
- Connect the Nederman arms to the grinding machines using flexible hoses
clients
Saudi Aramco Abqaiq
Location
Abqaiq, KSA
Contract Duration
2022
Total Manhours
6240 Hrs
Contact Us