Electrical, Instrumentation, and Control System works for new Power Plant

Scope of Project:
- The scope covers electrical assembly and erection for the entire system, including HV/MV transformers, switchgears, generators, panels, cable trays, conduits, and cables, as well as the underground and aerial grounding systems.
- It also includes the HV UGC 34.5 kV cable between the main transformer and substation, power and control cables (LV feeders, trip circuits, interlocks, and fiber optics) from the plant electrical building to the substation.
- Additionally, the scope encompasses instrumentation assembly, including supports, tubing, manifolds, pneumatic connections, conduits, cable trays, signal derivation/distribution boxes, and related instruments
clients
COX Energy/MAADEN
Location
Turaif, Saudi Arabia
Contract Duration
2025-On Going
Total Manhours
255000 Hrs